<span style="font-size:x-large;">'''Replacing or Overhauling Parts in Camotool'''</span>
+
= '''Step-by-Step: Replace or Overhaul Parts in CAMOTOOL''' =
  
−
&nbsp;
+
= <span style="font-size:medium;">'''1. Access the Work Order (WO)'''</span> =
  
−
<span style="font-size:medium;">'''Locate the Aircraft and Component:'''</span>
+
*
 +
Navigate to: '''Work Orders''' > '''Open Work Orders'''.
  
−
Access the specific aircraft (callsign) and identify the serialized component or generic part that needs replacing.
+
*
 +
Select a '''Package Work Order (PWO)'''. These are grouped tasks tied to inspections or scheduled maintenance like:
  
−
&nbsp;
+
**
 +
'''AMP REVIEW''' – Airworthiness Maintenance Program review.
  
−
&nbsp;
+
**
 +
'''100H ENG + PROP INSP''' – Every 100 flight hours, inspect engine and propeller.
  
−
<span style="font-size:medium;">'''Initiate a Work Order (WOP):'''</span>
+
**
 +
'''ARC/Annual''' – Annual Review of Airworthiness.
 +
 
  
−
Create a '''Work Order Package (WOP)''' associated with that aircraft. Enter details like installed materials, labor hours, and comments on the action performed
+
==== '''2. Review Tasks Related to Part Replacement or Overhaul''' ====
  
−
<span style="font-size:medium;">'''Record the Replacement/Overhaul:'''</span>
+
*
 +
Each PWO will contain individual tasks—some require part replacements due to life limits (e.g., filters, seals), others require inspections that might trigger a replacement or overhaul (e.g., worn brake discs, magnetos).
  
−
Log the removal of the existing part and add the new part (whether serialized or generic), possibly linking to a purchase order if it's a new component via the '''stock/warehouse module'''. Enter any associated data such as Form‑1 digital form, date of installation, and serial number.
+
*
 +
Look for task cards like:
  
−
<span style="font-size:medium;">'''Update Maintenance Rules / TBOs:'''</span>
+
**
 +
“Replace oil filter – 50H Interval”
  
−
If the part being replaced is governed by a '''rule''' (e.g., a rotable part with a Time Between Overhaul or a service directive), then the system should: Reset or update the '''TBO counters''' (flight hours, cycles, or dates). Trigger future maintenance tasks based on the updated timeline. Reflect any required '''inspect-and-overhaul directives'''.
+
**
 +
“Overhaul landing gear – 1,000H or 6 years”
  
−
<span style="font-size:medium;">'''Close the WOP and Generate Documentation:'''</span>
+
**
 +
“Remove & inspect propeller – 100H interval”
 +
 
  
−
Finalize the work order, typically generating associated documents, invoices, or delivery notes as needed
+
==== '''3. Navigate to the ‘Parts’ Module''' ====
 +
 
 +
*
 +
Go to: '''Parts''' > '''Inventory''' or '''Installed Parts'''.
 +
 
 +
*
 +
Search for the part by:
 +
 
 +
**
 +
'''Part Number'''
 +
 
 +
**
 +
'''Serial Number'''
 +
 
 +
**
 +
'''Aircraft Registration (Call Sign)''' – from your screenshot: e.g., F-HFEC, F-HFED.
 +
 
 +
*
 +
If the part is installed and needs removal:
 +
 
 +
**
 +
Use the “Remove” option and link it to the active WO task.
 +
 
 +
 
 +
==== '''4. Replace or Overhaul the Part''' ====
 +
 
 +
'''Replacement:'''
 +
 
 +
*
 +
Locate the new part in inventory.
 +
 
 +
*
 +
Use the “Install” option in the WO.
 +
 
 +
*
 +
Record the installation date, aircraft hours/cycles, and attach the EASA Form 1 or FAA 8130-3 form (traceability document).
 +
 
 +
 
 +
'''Overhaul:'''
 +
 
 +
*
 +
If a part is being overhauled:
 +
 
 +
**
 +
Remove it using the WO.
 +
 
 +
**
 +
Send to a certified MRO (Maintenance, Repair, Overhaul facility).
 +
 
 +
**
 +
Once returned with overhaul certs, mark it as "overhauled" and re-install or move it back to inventory.
 +
 
 +
**
 +
Attach overhaul documentation.
 +
 
 +
 
 +
==== '''5. Attach Documentation''' ====
 +
 
 +
*
 +
Go to: '''Documents''' module or link directly in the WO.
 +
 
 +
*
 +
Upload:
 +
 
 +
**
 +
Installation/Removal reports.
 +
 
 +
**
 +
Overhaul reports or release certificates.
 +
 
 +
**
 +
Task cards with technician sign-offs.
 +
 
 +
*
 +
Ensure traceability is complete for auditors and safety reviews.
 +
 
 +
 
 +
==== '''6. Close Work Order and Review''' ====
 +
 
 +
*
 +
A supervisor or CAMO engineer must '''review and approve''' the WO.
 +
 
 +
*
 +
Check off the '''“Reviewed”''' checkbox (as shown in your image).
 +
 
 +
*
 +
This step ensures everything has been signed off by a licensed certifying staff.
 +
 
 +
*
 +
Only after this step can the WO be marked “Completed” or used for billing.

Revision as of 12:40, 27 August 2025

Step-by-Step: Replace or Overhaul Parts in CAMOTOOL

1. Access the Work Order (WO)

Navigate to: Work Orders > Open Work Orders.

Select a Package Work Order (PWO). These are grouped tasks tied to inspections or scheduled maintenance like:

AMP REVIEW – Airworthiness Maintenance Program review.

100H ENG + PROP INSP – Every 100 flight hours, inspect engine and propeller.

ARC/Annual – Annual Review of Airworthiness.


2. Review Tasks Related to Part Replacement or Overhaul

Each PWO will contain individual tasks—some require part replacements due to life limits (e.g., filters, seals), others require inspections that might trigger a replacement or overhaul (e.g., worn brake discs, magnetos).

Look for task cards like:

“Replace oil filter – 50H Interval”

“Overhaul landing gear – 1,000H or 6 years”

“Remove & inspect propeller – 100H interval”


3. Navigate to the ‘Parts’ Module

Go to: Parts > Inventory or Installed Parts.

Search for the part by:

Part Number

Serial Number

Aircraft Registration (Call Sign) – from your screenshot: e.g., F-HFEC, F-HFED.

If the part is installed and needs removal:

Use the “Remove” option and link it to the active WO task.


4. Replace or Overhaul the Part

Replacement:

Locate the new part in inventory.

Use the “Install” option in the WO.

Record the installation date, aircraft hours/cycles, and attach the EASA Form 1 or FAA 8130-3 form (traceability document).


Overhaul:

If a part is being overhauled:

Remove it using the WO.

Send to a certified MRO (Maintenance, Repair, Overhaul facility).

Once returned with overhaul certs, mark it as "overhauled" and re-install or move it back to inventory.

Attach overhaul documentation.


5. Attach Documentation

Go to: Documents module or link directly in the WO.

Upload:

Installation/Removal reports.

Overhaul reports or release certificates.

Task cards with technician sign-offs.

Ensure traceability is complete for auditors and safety reviews.


6. Close Work Order and Review

A supervisor or CAMO engineer must review and approve the WO.

Check off the “Reviewed” checkbox (as shown in your image).

This step ensures everything has been signed off by a licensed certifying staff.

Only after this step can the WO be marked “Completed” or used for billing.