Difference between revisions of "How to replace parts"

From Camotool
 
(21 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
= '''Replace or Overhaul Parts in CAMOTOOL''' =
 
= '''Replace or Overhaul Parts in CAMOTOOL''' =
  
−
 
+
''<u><span style="font-size:medium;">'''1. Access the Work Order (WO)'''</span></u>''
−
 
 
−
= <span style="font-size:medium;">'''1. Access the Work Order (WO)'''</span> =
 
  
 
Navigate to: '''Work Orders''' > '''List Work Orders'''.
 
Navigate to: '''Work Orders''' > '''List Work Orders'''.
Line 10: Line 8:
 
Select a '''Package Work Order (PWO)'''. These are grouped tasks tied to inspections or scheduled maintenance like:
 
Select a '''Package Work Order (PWO)'''. These are grouped tasks tied to inspections or scheduled maintenance like:
  
−
'''AMP REVIEW''' – Airworthiness Maintenance Program review.
+
'''- AMP REVIEW''' – Airworthiness Maintenance Program review.
 +
 
 +
'''- 100H ENG + PROP INSP''' – Every 100 flight hours, inspect engine and propeller.
 +
 
 +
'''- ARC/Annual''' – Annual Review of Airworthiness.
  
−
'''100H ENG + PROP INSP''' – Every 100 flight hours, inspect engine and propeller.
+
[[File:WO.png|RTENOTITLE]]
  
−
'''ARC/Annual''' – Annual Review of Airworthiness.
+
<span style="font-size:larger;"><u>GREEN</u></span>: '''CLOSE Work Order.'''
  
−
&nbsp;
+
<span style="font-size:larger;"><u>RED</u></span>: '''OPEN Work Order.'''
  
−
==== <span style="font-size:medium;">'''2. Review Tasks Related to Part Replacement or Overhaul'''</span> ====
+
<u>''<span style="font-size:medium;">'''2. Review Tasks Related to Part Replacement or Overhaul'''</span>''</u>
  
 
Each PWO will contain individual tasks—some require part replacements due to life limits (e.g., filters, seals), others require inspections that might trigger a replacement or overhaul (e.g., worn brake discs, magnetos).
 
Each PWO will contain individual tasks—some require part replacements due to life limits (e.g., filters, seals), others require inspections that might trigger a replacement or overhaul (e.g., worn brake discs, magnetos).
Line 30: Line 32:
 
“Remove & inspect propeller – 100H interval”
 
“Remove & inspect propeller – 100H interval”
  
−
&nbsp;
+
Its a small description about the tasks to do.
  
−
==== <span style="font-size:medium;">'''3. Navigate to the ‘Parts’ Module'''</span> ====
+
''<u><span style="font-size:medium;">'''3. Navigate to the ‘Parts’ Module'''</span></u>''
  
−
Go to: '''Parts''' > '''Inventory''' or '''Installed Parts'''.
+
'''Parts''' > '''Inventory''' or '''Installed Parts'''.
  
 
Search for the part by:
 
Search for the part by:
  
−
'''Part Number'''
+
'''- Part Number'''
  
−
'''Serial Number'''
+
'''- Serial Number'''
−
 
 
−
'''Aircraft Registration (Call Sign)'''&nbsp;
 
  
 
If the part is installed and needs removal:
 
If the part is installed and needs removal:
  
 
Use the “Remove” option and link it to the active WO task.
 
Use the “Remove” option and link it to the active WO task.
 +
 +
[[File:Listparts12.png|RTENOTITLE]]
  
 
&nbsp;
 
&nbsp;
  
−
<span style="font-size:medium;">'''4. Replace or Overhaul the Part'''</span>
+
<u>''<span style="font-size:medium;">'''4. Replace or Overhaul the Part'''</span>''</u>
  
 
'''Replacement:'''
 
'''Replacement:'''
Line 60: Line 62:
 
'''Overhaul:'''
 
'''Overhaul:'''
  
−
If a part is being overhauled:
+
If a part is being overhauled you need:
  
 
Remove it using the WO.
 
Remove it using the WO.
Line 72: Line 74:
 
&nbsp;
 
&nbsp;
  
−
==== <span style="font-size:medium;">'''5. Attach Documentation'''</span> ====
+
<u>''<span style="font-size:medium;">'''5. Attach Documentation'''</span>''</u>
  
 
Go to: '''Documents''' module or link directly in the WO.
 
Go to: '''Documents''' module or link directly in the WO.
Line 78: Line 80:
 
Upload:
 
Upload:
  
−
Installation/Removal reports.
+
- Installation/Removal reports.
  
−
Overhaul reports or release certificates.
+
- Overhaul reports or release certificates.
  
−
Task cards with technician sign-offs.
+
- Task cards with technician sign-offs.
  
 
Ensure traceability is complete for auditors and safety reviews.
 
Ensure traceability is complete for auditors and safety reviews.
Line 88: Line 90:
 
&nbsp;
 
&nbsp;
  
−
==== '''6. Close Work Order and Review''' ====
+
''<u><span style="font-size:medium;">'''6. Close Work Order and Review'''</span></u>''
  
 
A supervisor or CAMO engineer must '''review and approve''' the WO.
 
A supervisor or CAMO engineer must '''review and approve''' the WO.
  
−
Check off the '''“Reviewed”''' checkbox (as shown in your image).
+
- Check off the '''“Reviewed”''' checkbox (as shown in your image).
  
−
This step ensures everything has been signed off by a licensed certifying staff.
+
- This step ensures everything has been signed off by a licensed certifying staff.
 +
 
 +
- Only after this step can the WO be marked “Completed” or used for billing.
 +
 
 +
&nbsp;
  
−
Only after this step can the WO be marked “Completed” or used for billing.
+
Some parts you can mark in a check box if is mandatoy Replace/Overhaul, take care when you assign this option.

Latest revision as of 12:55, 24 April 2026

Replace or Overhaul Parts in CAMOTOOL

1. Access the Work Order (WO)

Navigate to: Work Orders > List Work Orders.

Select a Package Work Order (PWO). These are grouped tasks tied to inspections or scheduled maintenance like:

- AMP REVIEW – Airworthiness Maintenance Program review.

- 100H ENG + PROP INSP – Every 100 flight hours, inspect engine and propeller.

- ARC/Annual – Annual Review of Airworthiness.

RTENOTITLE

GREEN: CLOSE Work Order.

RED: OPEN Work Order.

2. Review Tasks Related to Part Replacement or Overhaul

Each PWO will contain individual tasks—some require part replacements due to life limits (e.g., filters, seals), others require inspections that might trigger a replacement or overhaul (e.g., worn brake discs, magnetos).

Look for task cards like:

“Replace oil filter – 50H Interval”

“Overhaul landing gear – 1,000H or 6 years”

“Remove & inspect propeller – 100H interval”

Its a small description about the tasks to do.

3. Navigate to the ‘Parts’ Module

Parts > Inventory or Installed Parts.

Search for the part by:

- Part Number

- Serial Number

If the part is installed and needs removal:

Use the “Remove” option and link it to the active WO task.

RTENOTITLE

 

4. Replace or Overhaul the Part

Replacement:

Locate the new part in inventory.

Use the “Install” option in the WO.

Overhaul:

If a part is being overhauled you need:

Remove it using the WO.

Send to a certified MRO (Maintenance, Repair, Overhaul facility).

Once returned with overhaul certs, mark it as "overhauled" and re-install or move it back to inventory.

Attach overhaul documentation.

 

5. Attach Documentation

Go to: Documents module or link directly in the WO.

Upload:

- Installation/Removal reports.

- Overhaul reports or release certificates.

- Task cards with technician sign-offs.

Ensure traceability is complete for auditors and safety reviews.

 

6. Close Work Order and Review

A supervisor or CAMO engineer must review and approve the WO.

- Check off the “Reviewed” checkbox (as shown in your image).

- This step ensures everything has been signed off by a licensed certifying staff.

- Only after this step can the WO be marked “Completed” or used for billing.

 

Some parts you can mark in a check box if is mandatoy Replace/Overhaul, take care when you assign this option.